FILING CYCLES
Sub-Cycle 1A (01/01/2022 - 12/31/2023)
Sub-Cycle 1B (01/01/2024 - 12/31/2025)
Sub-Cycle 1C (01/01/2026 - 12/31/2027)

PARKING STRUCTURES (Zoom in to view locations)
Parking Only
Mixed Use

Built by DOB Analytics Dev Squad | This map shows the location of parking structures and filing cycle periods. Sub-Cycle 1A includes MN CDs 1-7, Sub-Cycle 1B includes all other CDs in MN and BK, and Sub-Cycle 1C includes BX, QN, and SI. Download Data (csv)